{"id":57053,"date":"2019-03-28T10:00:35","date_gmt":"2019-03-28T09:00:35","guid":{"rendered":"https:\/\/e326.greatsolution.dev\/?p=57053"},"modified":"2025-11-04T13:28:27","modified_gmt":"2025-11-04T12:28:27","slug":"s-4-hana-beyond-technology","status":"publish","type":"post","link":"https:\/\/e326.greatsolution.dev\/en\/s-4-hana-beyond-technology\/","title":{"rendered":"S\/4 Hana\u2014Beyond Technology"},"content":{"rendered":"<p>It\u2019s not that these companies are too ignorant or stubborn. The daily operations and current projects rather consume all available internal and external resources, to the point where the fear of a S\/4 Hana consolidation project becomes too big.<\/p>\n<h3>S\/4 Hana against heterogeneity and inconsistency<\/h3>\n<p>It\u2019s not unusual for companies to have very heterogeneous systems that grew organically over time. It\u2019s almost common now that different subsidiaries or manufacturing and sales departments run on different systems. The laborious collection of relevant data from different systems and the resulting inconsistency are a weak link in the value chain. Furthermore, inefficiency, redundancy, and obsolete processes in systems are not a suitable foundation for sustainable growth.<\/p><div class=\"great-fullsize-content-en\" style=\"margin-bottom: 20px;\" id=\"great-3072074978\"><a data-no-instant=\"1\" href=\"https:\/\/e326.greatsolution.dev\/en\/media-kit\/\" rel=\"noopener\" class=\"a2t-link\" target=\"_blank\" aria-label=\"nl_advertising_800x100\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100.jpg\" alt=\"\"  srcset=\"https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100.jpg 800w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-400x50.jpg 400w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-768x96.jpg 768w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-100x13.jpg 100w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-480x60.jpg 480w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-640x80.jpg 640w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-720x90.jpg 720w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-18x2.jpg 18w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2024\/08\/nl_werbung_800x100-600x75.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" width=\"1000\" height=\"100\"  style=\" max-width: 100%; height: auto;\" \/><\/a><\/div>\n<p>SAP is trying to combat these developments. S\/4 Hana is its way of providing customers with a safe roadmap towards the future. The migration to S\/4 Hana is not only a technological challenge, but also has cultural implications. Many perceive this to be an obstacle, but it is actually an advantage. Disruption is therefore not a buzzword, but a chance.<\/p>\n<p>S\/4 Hana is the foundation for new analytical possibilities. S\/4 provides users with operational reporting in real time which can be used for optimized decision processes in the system itself. This means that the data does not have to be transferred to a separate data warehouse or BI tool. It\u2019s also important to mention that S\/4 Hana enables companies to think outside of their systems and focus on processes and inter-divisional services.<\/p>\n<h3>End-to-end<\/h3>\n<p>For example, lead to cash is the first contact of the potential customer with the marketing system, lead nurturing in CRM and all subsequent financial processes. Everything is becoming an end-to-end process.<\/p>\n<p>Heterogeneous system landscapes, however, are not capable of handling the master data management and the intense maintenance of interfaces. Consequently, this means that processes have to change, and employees of different departments have to work closer together than ever before.<\/p>\n<p>The migration to S\/4 Hana is inevitable. It\u2019s also inevitable that the migration to S\/4 will be an immense IT project. CAP analysis and realistic predictions are obviously new technological prerequisites. Equally if not more important, however, is the company\u2019s commitment to S\/4 and Hana, trust in the SAP partner, and a strategic change management.<\/p>\n<h3>The journey to S\/4 Hana is the goal<\/h3>\n<p>What guarantees the success of a S\/4 Hana project? The staff! Employees have often worked with R\/3 for many years, and they have to be actively supported and encouraged on the road to S\/4. It might not be immediately clear to everyone what value a new interface has, or why processes have to be renewed, or why the company even decided on S\/4 and Hana in the first place.<\/p>\n<p>Therefore, companies need a SAP partner with know-how and employees that do not fear the project and their new work environment, but anticipate it eagerly\u2014or, at the very least, are neutral about it.<\/p>\n<h3>Platform idea and early adopters<\/h3>\n<p>S\/4 and the Hana platform want to exceed your highest expectations. With this new technology, SAP wants to provide users and customers with a platform which helps realize innovation projects and offers new functional possibilities through IoT scenarios and big data.<\/p>\n<p>S\/4 and Hana hold a lot of potential. Early adopters who trust SAP enough to make a leap of faith realistically still have a lot of manual effort and the prerequisite of strategic planning. However, innovations don\u2019t happen proportionally anymore, but exponentially.<\/p>\n<p>In this regard, SAP CEO Bill McDermott is right in saying, \u201cChange has never moved so fast, and it will never move this slowly again.\u201d Companies that adopt S\/4 and Hana early on do not only get a head start, but also a boost in innovation that only S\/4 can bring.<\/p>\n<p><a href=\"https:\/\/e326.greatsolution.dev\/en\/partners\/allgeier-enterprise-services-ag\/\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-22923 size-full\" title=\"S\/4 hana beyond technology\" src=\"https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner.jpg\" alt=\"https:\/\/e326.greatsolution.dev\/partners\/allgeier-enterprise-services-ag\/\" width=\"1000\" height=\"112\" srcset=\"https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner.jpg 1000w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-768x86.jpg 768w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-100x11.jpg 100w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-480x54.jpg 480w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-640x72.jpg 640w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-720x81.jpg 720w, https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2017\/05\/Allgeier-CI-Banner-960x108.jpg 960w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n\n\n<h2 class=\"wp-block-heading\"><a href=\"https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2025\/08\/1903_Allgeier_E_web.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">PDF in English<\/a><\/h2>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Many companies that are currently operating a more or less functional SAP R\/3 system know that maintenance and support for ERP\/ECC 6.0 and SAP Business Suite 7 will end in 2025. However, many companies are not really doing anything about it. Why is that?<\/p>","protected":false},"author":1704,"featured_media":4163,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","footnotes":""},"categories":[10,7,28431],"tags":[187,124,1727,25554,370,450,19701,6561],"coauthors":[28721],"class_list":["post-57053","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-das-aktuelle-stichwort","category-meinung","category-mag-1903","tag-bill-mcdermott","tag-crm","tag-end-to-end","tag-erp-ecc-6-0","tag-iot","tag-r3","tag-s-4-hana","tag-sap-business-suite-7","pmpro-has-access"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"thumbnail":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-150x150.jpg",150,150,true],"medium":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",400,172,false],"medium_large":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-768x331.jpg",768,331,true],"large":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"image-100":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-100x43.jpg",100,43,true],"image-480":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-480x207.jpg",480,207,true],"image-640":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-640x276.jpg",640,276,true],"image-720":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-720x310.jpg",720,310,true],"image-960":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-960x414.jpg",960,414,true],"image-1168":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"image-1440":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"image-1920":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"1536x1536":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"2048x2048":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"trp-custom-language-flag":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",18,8,false],"bricks_large_16x9":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"bricks_large":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"bricks_large_square":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",1000,431,false],"bricks_medium":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",600,259,false],"bricks_medium_square":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort.jpg",600,259,false],"profile_24":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-24x24.jpg",24,24,true],"profile_48":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-48x48.jpg",48,48,true],"profile_96":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-96x96.jpg",96,96,true],"profile_150":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-150x150.jpg",150,150,true],"profile_300":["https:\/\/e326.greatsolution.dev\/wp-content\/uploads\/2016\/12\/Das-aktuelle-Stichwort-300x300.jpg",300,300,true]},"post_excerpt_stackable_v2":"<p>Viele Unternehmen, die aktuell ein mehr oder weniger gut funktionierendes SAP-R\/3-System laufen haben, wissen, dass ab 2025 die Wartung von ERP\/ECC 6.0 und der SAP Business Suite 7 eingestellt wird. Viele besch\u00e4ftigen sich aber nur mit einer niedrigen Priorit\u00e4t damit. Warum?<\/p>\n","category_list_v2":"<a href=\"https:\/\/e326.greatsolution.dev\/en\/category\/opinion\/the-current-keyword\/\" rel=\"category tag\">Das aktuelle Stichwort<\/a>, <a href=\"https:\/\/e326.greatsolution.dev\/en\/category\/opinion\/\" rel=\"category tag\">Die Meinung der SAP-Community<\/a>, <a href=\"https:\/\/e326.greatsolution.dev\/en\/category\/mag-1903\/\" rel=\"category tag\">MAG 19-03<\/a>","author_info_v2":{"name":"Julia Rettig, Nagarro","url":"https:\/\/e326.greatsolution.dev\/en\/author\/julia-rettig\/"},"comments_num_v2":"0 comments","_links":{"self":[{"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/posts\/57053","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/users\/1704"}],"replies":[{"embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/comments?post=57053"}],"version-history":[{"count":3,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/posts\/57053\/revisions"}],"predecessor-version":[{"id":157740,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/posts\/57053\/revisions\/157740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/media\/4163"}],"wp:attachment":[{"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/media?parent=57053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/categories?post=57053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/tags?post=57053"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/e326.greatsolution.dev\/en\/wp-json\/wp\/v2\/coauthors?post=57053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}